Subic-Clark-Tarlac New Road Expressway ( SCTEX) |
| |
Started |
February 01, 2006 |
| |
Completion |
May 2008 |
| |
Clients |
Bases Conversion
Development Authority (BCDA) |
| |
Main Contractor |
KAJIMA
Corporation (Japan) |
| |
Scope of work
|
Hydroseeding
and slope net Installation for cut slopes and embankments
And Grassing of
left, centre and right side of road. (PACKAGE 1) |
| |
Status |
On going |
| |
|
|
| |
·
Subic-Clark-Tarlac New Road Expressway (SCTEX) |
| |
Started |
July 01,
2006 |
| |
Completion |
May 2008 |
| |
Clients |
Bases
Conversion Development Authority (BCDA) |
| |
Main Contractor |
HAZAMA
Corporation (Japan) |
| |
Scope of work
|
Hydroseeding of all carriage way embankments and the Grassing of
centre strip.
(PACKAGE 2) |
| |
Status |
On going |
| |
|
|
| |
· Penta-Shimizu-Toa
Joint Venture (Subic Bay Port Development Project) - Subic,
Zambales |
| |
Clients |
(SBMA) |
| |
Main Contractor |
PENTA-SHIMIZU-TOA
Joint Venture |
| |
Scope of work
|
Hydroseeding / slope protection on embankments |
| |
Status |
On going |
| |
|
|
| |
·
Costa
De Hamilo - Nasugbu, Batangas |
| |
Clients |
SM
DEVELOPMENT CORPORATION |
| |
Scope of work
|
Hydroseeding / Slope
Protection |
| |
Status |
On going |
| |
|
|
| |
·
Anvaya
Cove (Ayala Land) – Morong Bataan |
| |
Clients |
AYALA
LAND CORP. |
| |
Scope of work
|
Hydroseeding of all designated
disturbed areas |
| |
Status |
On going |
| |
|
|
| |
·
North
Luzon Expressway (NLEX) for Leighton Contractor Asia Ltd. |
| |
Scope of work
|
Hydrostolonizing and
hydromulching for erosion control and revegatation |
| |
Status |
On going till
December 2006 |
| |
|
|
| |
·
Ayala
Greenfield Estate – Calamba, Laguna |
| |
Clients |
AYALA
LAND CORP. |
| |
Scope of work
|
Soil erosion control
protection by hydroseeding (PHASE I & II) |
| |
Status |
Completed |
| |
|
|
| |
·
Laguna
Properties Holdings – Lipa City |
| |
Scope of work
|
Soil erosion control
protection by hydroseeding |
| |
Status |
Completed 2004 |
| |
|
|
| |
·
San
Roque Multipurpose Dam – San Roque, Pangasinan |
| |
Clients |
World
Bank Thru Main Contractor
RAYTHEON EBASCO OVERSEAS LTD. (U. S. A.) |
| |
Scope of work
|
Erosion control by
hydroseeding |
| |
Status |
Completed 2001 |
| |
|
|
| |
·
Makati
Development Corporation – Cabuyao, Laguna |
| |
Scope of work
|
Slope protection by
hydroseeding |
| |
Status |
Completed 2005 |
| |
|
|
| |
·
Fort
Bonifacio Development Corporation – Taguig |
| |
Scope of work
|
Dust control and erosion
control by hydromulching with live stolons |
| |
Status |
Completed 1998 |
| |
|
|
| |
·
Laiya
Tourism Development Corporation – San Juan, Batangas |
| |
Scope of work
|
Design, construct a six (6)
hectares golf driving range completed with man made lagoon |
| |
Status |
Completed 1999 |
| |
|
|
| |
·
Sta.
Elena Golf and Country Club (27 holes) – Sta. Rosa, Laguna |
| |
Scope of work
|
Turf grass nursery
construction, feature shaping, fine shaping, irrigation
installation, bunker construction, driving range construction,
greens and tees construction, lake development, secondary
drainage construction, hydromulching turf grass stolonizing,
turf grass development, grow-in and maturing |
| |
Status |
Completed 1993 |
| |
|
|
| |
·
Mimosa
Leisure Estate (36 holes) – Clark Air Base, Pampanga |
| |
Scope of work
|
Turf grass nursery
construction, driving range construction, feature shaping, fine
grading, soil chemical sterilization, irrigation installation,
bunker construction, greens tees construction, lake development,
secondary drainage construction, hydroseeding, turf grass
stolonizing, grow-in and maturing |
| |
Status |
Completed 1997 |
| |
|
|
| |
·
Mimosa
Leisure Estate (Golf villas) – Clark Air Base |
| |
Scope of work
|
Design and installation of
residential villas turf irrigation watering system |
| |
Status |
Completed 1998 |
| |
|
|
| |
·
Manila
Golf Club (18holes) – Makati City |
| |
Scope of work
|
Design and construct a
complete turf irrigation system complete with pumping plant
manual gate valve open and close operation |
| |
Status |
Completed 1999 |
| |
|
|
| |
·
Intramuros Golf Links Golf Course – Intramuros, Manila |
| |
Scope of work
|
Design and construct a
complete automatic irrigation watering system, feature grading,
fine shaping, greens tees construction and development, driving
range construction, hydroseeding, bunker construction, turf
grass grow-in and maturing |
| |
Status |
Completed 1977 |
| |
|
|
| |
·
Batulao Village Club (18 holes) – Nasugbu, Batangas |
| |
Scope of work
|
Turf grass nursery and driving
range construction, feature grading, greens and tees
construction, hydrostolonizing grow-in and maturing |
| |
Status |
Completed 1974 |
| |
|
|
| |
·
Mayon
Imperial Golf Club (9 holes) – Legaspi City |
| |
Scope of work
|
Design and construction of
turf irrigation and secondary drainage system |
| |
Status |
Completed 5
holes only due to volcano eruption |
| |
|
|
| |
·
Philippine Geothermal Project – Palinpinon Dumaguete |
| |
Scope of work
|
Re-vegetation of all the pipe
line corridors and thermal ponds by hydroseeding |
| |
Main Contractor |
Ecco
Asia (Phils.) |
| |
Status |
Completed 1975 |
| |
|
|
| |
·
Philippine Geothermal Project – Palinpinon Dumaguete |
| |
Scope of work
|
Slope protection and
embankment by hydroseeding |
| |
Main Contractor |
Daewoo
Corporation (Korea) |
| |
Status |
Completed
2002 |
| |
|
|
| |
·
Raffles Country Club (18 holes) – Jorong Singapore |
| |
Scope of work
|
Turf grass hydromulching,
feature grading, sub-soil drainage construction, greens and tees
development, turf grass grow-in and maturing |
| |
Main Contractor |
Chuan
Joo Pte. Ltd. |
| |
Status |
Completed
1981 |
| |
|
|
| |
·
Tanah
Merah Tampines Course (18 holes) – Singapore |
| |
Scope of work
|
Turf grass nursery
construction and development, feature shaping, secondary
drainage construction, hydrostolonizing turf grass grow-in and
maturing |
| |
Main Contractor |
Song
Hup Seng Pte. Ltd. |
| |
Status |
Completed
1982 |
| |
|
|
| |
·
P.T.
Mulia International (18 holes) – Guling Gunis Indonesia |
| |
Scope of work |
Turf grass nursery and driving
range construction, secondary drainage construction, fine
shaping, greens and tees construction, bunder construction, turf
grass stolonizing grow-in and maturing |
| |
Status |
Completed 1983 |
| |
|
|
| |
·
Batam
Island Golf Club (9 holes) – Batam Island, Indonesia |
| |
Scope of work |
Turf grass nursery and driving
range construction, greens tees constructions, feature shaping,
hydroseeding turf grass grow-in and maturing |
| |
Status |
Completed 2000 |
|
|